• Home
  • About
  • Find Us
    • Facebook
    • Twitter
    • Google +

Engineering Heaven

  • About Us
  • Static Page Sample
  • Contact Us
    • Kang Ismet
    • Contact on Facebook
    • Contact on Twitter
    • Free Template Design
  • Entertainment
  • Health
  • World News
  • Videos
  • Image
  • Download
  • More
    • Editorial
    • Off Topic
















Newer Posts Older Posts

Popular Posts

  • Box Culvert Design Using Visual Basic-6.0 (Part-2)
    CHAPTER-2 BOX CULVERT 2.1 DEFINITION OF CULVERT : Culverts refer to the structures provided across a watercourse...
  • Box Culvert Design Using Visual Basic-6.0 (Part-6)
    = 0.5*0.12*8.75 = 0.525 k/ft 3.1.7 UPWARD SOIL PRESSURE : Upward soil pressure at the bottom slab may calculated from the following- From...
  • Box Culvert Design Using Visual Basic-6.0 (Part-3)
    CHAPTER - 3 DESIGN OF BOX CULVERT 3.1 DESIGN OF ONE UNIT BOX CULVERT When the depth of fill is 2 ’ or more...
  • Box Culvert Design Using Visual Basic-6.0 (Part-4)
    Load combination AASHTO group X = DL + ( LL + I ) + E with no increase in allowable unit stress will followed for the purpose of analy...
  • Box Culvert Design Using Visual Basic-6.0(Part-1)
    ABSTRACT Culverts are defined as structures which provide a passage over a gap without closing the way beneath which may be needed for the p...
  • Box Culvert Design Using Visual Basic-6.0 (Part-5)
    In case of concealed slab Effective width, E = 1.75 * 8 = 14 ft. Therefore, let us assume, ...
  • Box Culvert Design Using Visual Basic-6.0 (Part-7)
  • Under-Reamed Piles: Safest Foundation Solution for Black Cotton soil
    Swelling and shrinkage due to the property of volumetric changes of expansive soil like black cotton soil results movement of the ground pro...
  • USC University Hospital, California: The Tested U.S. Base Isolated Building
    The University of Southern California Teaching Hospital in east Los Angeles (1991) had a severe test in 1994, when the Northridge earthquake...

Followers

Pages

  • Home

Sample Text

Powered by Blogger.

Pages - Menu

  • Home

Blog Archive

  • ►  2011 (2)
    • ►  May (2)
  • ▼  2010 (7)
    • ▼  April (1)
      • Box Culvert Design Using Visual Basic-6.0 (Part-7)
    • ►  March (1)
    • ►  January (5)

Label

  • AASHTO (6)
  • abutment (6)
  • Box Culvert (6)
  • Box Culvert Design (6)
  • Comuter Aided Design (6)
  • Culverts (6)
  • impact moment (6)
  • Visual Basic (6)

Blog Archive

Category

  • AASHTO (6)
  • abutment (6)
  • Box Culvert (6)
  • Box Culvert Design (6)
  • Comuter Aided Design (6)
  • Culverts (6)
  • impact moment (6)
  • Visual Basic (6)

Advertise

  • AASHTO (6)
  • abutment (6)
  • Box Culvert (6)
  • Box Culvert Design (6)
  • Comuter Aided Design (6)
  • Culverts (6)
  • impact moment (6)
  • Visual Basic (6)

Label

  • AASHTO (6)
  • abutment (6)
  • Box Culvert (6)
  • Box Culvert Design (6)
  • Comuter Aided Design (6)
  • Culverts (6)
  • impact moment (6)
  • Visual Basic (6)

Visitors

Engineering Heaven © 2012 | Design by Kang Ismet - Bloggerized by Free Blogger Templates Gallery Supported by Free Classified Ads